<address id="7vhuv"></address>
  1. <tt id="7vhuv"></tt>

    Mobile

    |

    WeChat

    MAP

    NEWS


    Current location:Home> News> Company news

    The steel structure grid was assembled successfully
    Release time:2020-11-12 10:12:20      Number of hits:761

    After two months of hard work by the builder, on the morning of July 30, with the lifting of the last steel skeleton and the completion of the positioning installation, the steel structure grid structure of The traffic hub of Dripping Lake in Lingang New Town was successfully completed and assembled, marking an important step in the construction of The traffic hub of Dripping Lake. Located in the north of the center of Lingang New City, the Project covers an area of about 73,300 square meters and involves the ground square, bus hub and supporting underground space around the terminal station of Line 16 of rail transit. After the completion of the project, it will realize multi-level seamless transfer and docking between various transportation modes and rail transit. After the completion of the construction, the builder will start the erection of aluminum alloy roof board, which is scheduled to be completed around the end of October.


    News you are interested in
    Previous:The characteristics of installation and construction of grid
    Next:How does the scaffold of steel structure project calculate?

    Back to list

    CONTACT US


    Online Message

    Relying on excellent quality and good service, it has won the trust and praise of the majority of users and won many honors

    Copyright ? 2020 All Rights Reserved All rights reserved: Xuzhou anmeigu Architectural Space Structure Co., Ltd

    All rights reserved: Xuzhou anmeigu Architectural Space Structure Co., Ltd

    Technical Support: winsharing
    日本精品啪啪一二三区,久久毛片免费看一区二区,无码国产69精品久久久久网站,亚洲无码精品视频福利
      <address id="7vhuv"></address>
    1. <tt id="7vhuv"></tt>